The coating process design of car plastic bumper
Time:2014-04-02 11:55:31

       The car bumper is the car important exterior decoration part, along with the car coating request unceasing enhancement, the bumper coating also more and more receives each specialized factory's attention. Car bumper mainly adopts plastic material, coating on the surface is difficult to attach, and low thermal deformation temperature of the plastic parts, generally in use in the production of paint drying temperature is lower than the drying temperature of the coating used of the metal, so the plastic coating and metal coating are quite different in process and coating materials, bumper painting with car coating commonly mixed production line. At present, some large domestic automobile manufacturers have taken the injection molding and painting of the bumper as an important part of vehicle production, and built the injection molding and painting workshop of the bumper when planning the new factory. For example, Toyota has built a resin workshop (namely the injection molding and painting workshop of the bumper and other plastic parts) in the domestic construction factory. The bumper of some automobile factories in China is provided by the large-scale professional plastic parts processing factory, and the large-scale automobile plastic parts production factories in China include Jiangyin molding and Shanghai Yanfeng Weistong, etc.

       The design of a number of bumper coating lines in China has absorbed the experience and technology of Japan, South Korea, Europe and The United States, etc. These coating lines have many different places in the process, equipment layout and mechanized form. In order to reduce the processing cost of plastic bumpers and improve their coating quality, a lot of researches have been made on coating materials, coating process and coating equipment, etc., and some achievements have been made. Therefore, the coating line design has undergone great changes in recent years.

1. Overall layout of coating line

       The overall arrangement of large coating lines tends to be regionalized and three-dimensional. The same or similar equipment and processes should be arranged in the same area as far as possible to facilitate the organization and management of production. The first floor is mainly equipped with the upper and lower parts (including the cache area), pre-treatment, polishing, inspection, decoration and auxiliary equipment; The second floor is mainly equipped with spray paint room and air conditioning platform area; The drying room is arranged on three floors. This three-dimensional arrangement of equipment is more conducive to improve the cleanliness of the spraying clean area, which is of great help to improve the qualification rate of the products off the production line at one time. The whole painting workshop is a fully enclosed workshop, which is manually operated on one side of the production line during upper and lower parts. The high-end bumper painting adopts automatic spraying, and the exhaust gas in the painting room is discharged after centralized high-altitude emission or centralized incineration. The paint supply system adopts the combination mode of centralized paint supply and small line system paint supply.

2 Coating materials

       Plastic bumper heat resistance is poor, when high temperature easy deformation, so the bumper coating generally cannot choose drying temperature is too high coating, drying temperature is about 80±5℃ and 120±5℃ for domestic paint. The bumper coating is composite coating namely primer + color paint + varnish, primer has two components and one component two, color paint mostly USES one component paint, varnish mostly USES two components paint. The two-component primer has a better covering force after baking, and can polish the surface particles and other paint defects, especially suitable for the appearance of the plastic parts are poor, but the two-component primer under the wet film state of electrical conductivity is generally poor, such as the primer is not dried spraying paint will affect the adhesion of color paint. Two - component varnish wide construction range, compared with one - component varnish, with less pollution, easy to adjust the advantages. The application of two-component primer and varnish system has disadvantages such as large equipment investment and complex maintenance of paint conveying pipeline, but the paint itself is easy to be adjusted, and it is easy to obtain a good surface condition of paint film.

3 Coating process

3.1 Main process forms of coating line

       There are several commonly used coating processes for plastic bumpers:

       Three spray and two drying (3C2B) process: top → pre-treatment → moisture drying → flame treatment → top masking → remove static electricity → primer spray → leveling → primer inspection/grinding → Remove static electricity → color paint spray → leveling → varnish spray → leveling → drying → strong cooling → inspection and modification → next parts → defective products repair;

Three spray and one drying (3C1B) top parts → pretreatment → moisture drying → flame treatment → top masking → remove static electricity → primer → leveling → paint spraying → leveling → varnish spraying → leveling → drying → strong cooling → inspection and modification → next parts → defective products repair;

       The 3C1B process can save the one-time investment of equipment and the operating cost of equipment in the later stage. The existing plastic bumper coating line with large production capacity in China adopts this process form and has been put into mass production with relatively stable operation.

3.2 prior to processing

       The pretreatment of the plastic bumper before painting is mainly to remove the dust, oil and residual release agent on the surface of the workpiece, and at the same time to activate the surface. Poor pretreatment can lead to poor adhesion, shrinkage cavity and particle defects. There are two forms of pretreatment, one is automatic spraying, the other is manual wiping. Automatic spraying is to hang the workpiece on the conveying equipment through the pretreatment spray line, the main process is: pre-degreasing → degreasing → washing 1→ washing 2→ fresh DI washing → water blowing → moisture drying → strong cold; Manual wipe is mainly used to wipe the whole workpiece surface manually with solvent, which can reduce the one-time investment of equipment and its operating cost. Domestic large quantities of plastic bumper coating line mostly adopts automatic spraying, small quantities of bumper coating and small parts coating mostly adopts manual wiping method.

3.3 Flame treatment

       The flame treatment further activates the workpiece surface. The robot jets flames to the surface of the workpiece. Manual and automatic electrostatic removal procedures are set after the flame treatment process to enhance the binding force between the workpiece and the coating film.

3.4 on the cover

       On the screen is mainly on the surface of the workpiece some do not need to be sprayed on the area to cover processing, the general line more difficult to cover, using more line shielding.

3.5 spray paint

       Workpiece spraying mostly adopts the combination of robot automatic spraying and artificial spraying, first automatic spraying, and then manual inspection of supplementary spraying. Some production lines can be completely automatic spraying after commissioning and enter into mass production. Automatic painting mainly adopts robot spraying. Generally, air spray gun is used for primer, cup rotary workstation + spray gun workstation is used for color paint and spray gun + cup workstation is used for varnish 2 workstations.

4 Coating equipment

       The equipment of plastic bumper coating line mainly includes mechanical conveying equipment, pretreatment equipment, flame treatment equipment, spray painting room equipment, drying furnace and artificial working area equipment, etc.

4.1 Mechanical conveying equipment

       Plastic bumper spraying line mechanized transport equipment in the form of more, there are general suspension transport chain, reverse cumulative chain and skid transport, friction transport form. Skid transport layout is flexible. In recent years, many production lines built in China have adopted skid transport. Japanese bumper coating line mainly adopts reverse cumulative chain and friction transport mode. Considering that some equipment of the pretreatment process conveying system has the requirements of waterproofing and anti-rot and the influence of drying process temperature, the driving device of the skid conveyor system in the general pretreatment and drying process adopts the external type.

4.2 Pre-processing equipment

       The pretreatment equipment mainly includes non-standard equipment, circulation system and exhaust system. The degreasing liquid of plastic bumper is slightly acidic (pH value is generally around 6.4), which is different from the degreasing liquid of car body, so the pre-treatment equipment should consider acid resistance, it is recommended that the pre-treatment closed chamber body and tank body adopt stainless steel material. The top of the pre-treatment equipment room is equipped with an exhaust fan to avoid the gas diffusion to the outside of the room. It is suggested that a maintenance platform, a maintenance door and a cantilever searchlight be installed on one side of the pre-treatment room to facilitate the maintenance and repair of the equipment.

4.3 spray room

       The existing domestic painting production line of the spray painting room has The Van Winkle spray painting room, the water spin spray painting room and the water curtain type spray painting room and so on, now USES the Van Winkle spray painting room. There are two kinds of air supply and exhaust system in spray chamber: fresh air and self-circulation air. The all-fresh air mode is that the air supply air conditioning unit in the spray chamber takes air from the outside of the chamber and sends it to the spray chamber after multi-stage treatment of the air conditioning unit. After the air is utilized in the spray chamber, the exhaust fan in the spray chamber is all discharged into the atmosphere. The self-circulation air mode is the air circulation utilization in the spray painting room (that is, the air enters the spray painting room through the air supply air conditioner, and then returns to the air supply air conditioner through the circulating air treatment equipment for reuse), the air in the spray painting room is not all discharged, only part of the discharge and part of the supplement. The amount of air supply and exhaust shall be calculated according to the balance of air flow in the spray chamber, the limit concentration of exhaust gas explosion in the spray chamber and the requirements of paint performance. Some production lines are designed to supplement the air flow with 10%, 30% of the total circulation air flow. The air volume of spray chamber exhaust and fill air should not be too low, too low will lead to the circulation of the wind organic solvent content is too high, easy to cause paint film surface gloss, and spray construction parameters control is more difficult. The concentration of exhaust gas in the spray chamber with circulating air is high (exceeding the requirements of national environmental protection standards), and the exhaust gas shall be incinerated back into the atmosphere (the exhaust gas after incineration can meet the national environmental protection requirements). The temperature of the painting room is generally required to be controlled at about 23℃, heat exchange in winter, refrigeration in summer, the use of fresh air coating production line energy consumption is large. The use of circulating air conditioning can reduce the energy consumption of production line (comprehensive energy consumption can be reduced by more than 30%, the installed power of related equipment can be reduced by 40%), and save the operating cost. Spray chamber adopts circulation air supply, corresponding spraying form should adopt automatic spraying, because the circulation air harmful gas content is high, not suitable for manual operation, such as artificial spraying should wear clothing and masks with anti-gas function.

4.4 drying furnace

       Baking furnace are mainly in the form of straight through, bridge and П type 3 kinds. The mechanical conveying of Japanese coating production line mostly adopts the form of reverse cumulative chain, and the drying furnace is the bridge drying furnace. Europe and the United States system using light skid transportation system, drying furnace for drying furnace П type. Double stroke drying oven is used to reduce heat dissipation area and energy consumption.

4.5 Paint supply system

       There are two paint systems, one is the centralized paint system, that is, all the paint is concentrated in a specific area for deployment, the centralized paint system to be arranged in the distance of three paint rooms near the place, to reduce the paint pipe passing long caused by the pressure loss and temperature loss, and avoid the pipeline cleaning difficulties; The other is the line edge system, that is, the paint transfer equipment is placed near the spray chamber. The volume of paint supplying tank used by the line-edge system is relatively concentrated, so the line-edge system is also known as the small system. The advantage of the small system is that it can meet the spraying production under the condition of small paint feeding. It can be used for infrequent production of color paint, new color trial production and temporary adjustment of color coating. A centralized paint system is used for primers, varnishes, and several high volume paints.

Service hotline

020-36860788

WeChat

Feedback

Feedback

亚洲图片 欧美 | gogogo高清免费完整版国语 | 久久激情片 | 国产调教 | 99性视频 | 久久视频一区 | 波多野结衣一区二区三区四区 | 久久激情小说 | 精品爆乳一区二区三区无码av | 快播色图 | 最新中文字幕在线观看视频 | 日本黄色三级网站 | 天天看黄色片 | 日本一级片免费看 | 岛国av一区二区三区 | 韩国三级在线播放 | 亚洲av成人无码一二三在线观看 | 最新中文av | 欧美一级视频在线观看 | 好吊操这里有精品 | 激情文学综合网 | 空姐吹箫视频大全 | 免费无码又爽又黄又刺激网站 | 射区导航| 国产亚洲天堂 | 国产精品久久久久久久久夜色 | 好吊妞这里有精品 | 按摩害羞主妇中文字幕 | www.亚洲精品 | 日韩亚洲一区二区三区 | 国产伊人av| 少妇精品 | 少妇又紧又深又湿又爽视频 | 91看大片| 中文字幕一区二区三区乱码 | 日韩精品播放 | 欧美一区二区在线看 | 欧美孕妇性xx | 丰满放荡岳乱妇91ww | 一区二区精品视频 | 毛片久久久久久 | 中国字幕在线观看免费国语版 | 巨胸大乳www视频免费观看 | 澳门黄色一级片 | 欧美成综合 | 在线视频网站 | 少妇视频在线 | 国产又粗又猛又黄又爽 | 幽幻道士在线观看高清国语免费 | 日韩免费视频观看 | 在线观看一区视频 | 亚洲视频图片小说 | 97成人免费视频 | 台湾黄色网址 | 你懂的视频在线播放 | 精品国产一区二区三区四区 | 人人妻人人澡人人爽国产一区 | 欧美国产精品一区二区 | 黄色aa视频| 日韩精品极品视频在线观看免费 | 成人激情片 | 日韩av电影中文字幕 | 精品人妻少妇嫩草av无码专区 | 一区精品视频 | 日韩av中文在线 | 在线国产一区二区 | 国产乱码精品一区二三赶尸艳谈 | 五月天av在线 | 国内一区二区 | 国产午夜免费 | 亚洲性生活片 | 波多野结衣片子 | 97国产成人无码精品久久久 | 草草影院国产第一页 | 亚洲人体av | 欧洲一级片 | 日本视频中文字幕 | 永久免费不卡在线观看黄网站 | 自拍偷拍第5页 | 婷婷视频在线 | 男人日女人网站 | 色呦呦网站入口 | av黄色免费| 30一40一50老女人毛片 | 女人18毛片水真多 | 欧美日韩亚洲在线观看 | 97精品久久 | 特级淫片裸体免费看冫 | 亚洲精品一区二区口爆 | 国产女人和拘做受视频免费 | av一区二区三区在线 | 欧美日韩激情在线 | 国产国语老龄妇女a片 | 日本久久精品视频 | 日韩中出 | 波多野结av衣东京热无码专区 | 亚洲在线视频免费观看 | 久热精品视频在线播放 | 麻豆精品少妇 | 五月天久久| 最新超碰在线 | 五月激情丁香网 | 国产拍拍拍拍拍拍拍拍拍拍拍拍拍 | 韩国伦理在线看 | 免费涩涩视频 | 亚洲婷婷免费 | 中文字字幕在线中文 | 中文在线一区二区 | 欧美日韩一区二区三区四区五区六区 | 日韩精品在线观看免费 | 色妞ww精品视频7777 | 人人妻人人澡人人爽久久av | 8090超碰| 伊人伊人网 | 蜜桃av噜噜一区二区三区 | 一区二区三区精品在线观看 | 日韩精品伦理 | 欧美性做爰免费观看 | 国产v片 | 日韩欧美电影 | 精品国产一区二区三区在线观看 | 玖玖爱免费视频 | 男女做那个视频 | 久久久久亚洲av无码麻豆 | 一级黄色网 | 男女互插视频 | 免费国产网站 | 欧洲亚洲综合 | 欧美韩国日本 | 成人福利免费视频 | 麻豆视频免费入口 | 日本三级片在线观看 | 国产精品久久国产精麻豆96堂 | 性欧美bbw| 亚洲社区在线 | 四虎影视在线播放 | 国产一二三级 | 天天夜夜爽 | 亚洲精品一区二区18漫画 | 四虎影院在线视频 | 无码人妻精品一区二区三应用大全 | 深夜网站在线观看 | 看免费毛片 | 884aa四虎影成人精品一区 | 特大巨交吊性xxxx | 人人澡人人干 | 黄色污污视频在线观看 | 亚洲激情社区 | 伊人在线视频 | 麻豆传谋在线观看免费mv | 色伊人网 | 亚洲一区二区三区四区在线观看 | 国产理论片 | 精品黑人一区二区三区 | 日本成人午夜视频 | 久久久久久久久网站 | 青青草综合网 | 丰满尤物白嫩啪啪少妇 | 91香蕉国产在线观看软件 | 精品乱子伦一区二区三区 | 日韩狠狠 | 色哟哟入口国产精品 | 天天干天天做 | 夫妻黄色片 | 不卡的一区二区 | 三级在线免费 | 爱爱高潮视频 | 色www亚洲国产阿娇yao | 日韩视频欧美视频 | 国产精品美女一区二区三区 | 午夜黄网 | 国产精品网址 | 欧美日韩少妇 | 制服丝袜av电影 | 中文字幕一区二区视频 | 美女黄视频大全 | 欧美日韩亚洲二区 | 一区二区三区午夜 | 乳色吐息在线观看 | 日本三级理论片 | 日韩脚交footjobhd | 污片免费观看 | 亚洲精品视频免费观看 | 噜噜噜在线视频 | 免费成人电影在线观看 | 国语一区 | 国产免费www | 日本一区二区三区精品视频 | 只有精品| 国产黄色一区二区 | 日本中文字幕在线免费观看 | 国产真实伦对白全集 | 国产黄色av | 在线麻豆视频 | 中国妇女做爰视频 | 国产农村老头老太视频 | 亚洲一区在线播放 | 一级片久久久 | 麻豆视频国产 | 国产精品100 | 最好看的2019免费观看 | 亚天堂 | 水蜜桃影库| 国产一级在线观看视频 | 亚洲69av | 永久精品 | 成人黄色三级视频 | 自拍偷拍精品视频 | 日韩福利视频 | 国产小视频在线播放 | 精品日韩一区 | 青娱乐在线视频观看 | 亚洲国产果冻传媒av在线观看 | 亚洲a网 | 蜜桃视频www | 97人人插 | 第一福利在线 | 日本一本不卡 | 成人免费91 | 五月天综合激情网 | 嫩草在线视频 | 视频在线观看免费大片 | 影音先锋日韩资源 | 五月精品 | 日韩专区一区 | 国产va在线观看 | 91麻豆影院 | 欧美日韩中文字幕在线 | 最好看的日本字幕mv视频大全 | 国产精品美女网站 | 欧美日韩高清不卡 | 男人操女人的网站 | 福利小视频在线 | 中文字幕丰满孑伦无码专区 | 欧美精品乱码视频一二专区 | 饥渴放荡受np公车奶牛 | 午夜草逼 | 日韩第四页 | 男人午夜网站 | 女女互慰揉小黄文 | 国产91在线播放精品91 | 国产全肉乱妇杂乱视频 | 三级视频小说 | 国产啊啊啊啊 | 欧美日韩高清一区二区 | 国产精品电影在线观看 | 国产日韩在线观看视频 | 国产麻豆免费观看 | 东方欧美色图 | 国产精品福利一区二区 | 日韩精品网站 | 久久久在线观看 | 无码人妻精品一区二区三区温州 | 欧美天天 | 亚洲大尺度视频 | 谁有av网址 | 四虎影院新网址 | 天堂一区二区三区 | 亚洲一区二区三区在线 | 国产成人a亚洲精v品无码 | 精品国产午夜福利 | 国产精品av一区 | 婷婷资源网 | 欧美日韩一区二区在线 | 美女免费网站 | 国产精品无码一区二区三区 | 海角社区在线 | 一级特黄aa大片欧美 | 成人福利视频网 | 中文一区在线观看 | 中文字幕 亚洲一区 | 亚洲一区二区三区四区 | 成人网导航| 亚洲免费视频一区二区三区 | 人妻激情偷乱视频一区二区三区 | 国产精品毛片va一区二区三区 | 四虎成人精品在永久免费 | 久久久久亚洲av片无码下载蜜桃 | 日韩激情影院 | 日韩av一二三区 | 免费观看日批视频 | 欧美性受xxxx黑人xyx | 欧美毛片基地 | 久久精品视频18 | 巴西丰满白嫩bbwbbw | 国产精品wwww | 日韩国产亚洲欧美 | 欧美挤奶吃奶水xxxxx | 肥臀熟女一区二区三区 | 亚洲精品成av人片天堂无码 | 成年视频在线观看 | 亚洲啪啪网站 | 四虎一区二区 | 国产成人无码www免费视频播放 | 激情小说综合 | 免费的av网站 | 乱色视频| 欧美日韩一 | 日日干,夜夜操 | 不卡视频在线播放 | 国产精品视频在线免费观看 | 岛国av网址 | 91麻豆精品久久久久蜜臀 | 激情超碰| 美女污污视频 | 成人午夜淫片100集 国产大片b站 | 久久久久蜜桃 | 亚洲最大黄色网址 | 天天欧美 | 婷婷丁香一区二区三区 | 超碰免费视| 中文无码熟妇人妻av在线 | 婷婷六月综合 | 欧美另类老妇 | 国产剧情在线 | 制服丝袜在线视频 | 乌克兰黄色片 | 国产一级自拍 | 国产精品伦理 | 中文字幕 日本 | 日日夜夜伊人 | www.av在线| 亚洲欧洲自拍偷拍 | 亚洲精品女人 | 日韩av手机在线播放 | 二区视频在线 | 国产三级按摩推拿按摩 | 国产精品视频一区二区三区, | 国模无码大尺度一区二区三区 | 亚洲第一大网站 | 特黄大片又粗又大又暴 | 国产精品50页 | 性高潮久久久久久久久 | 日韩一区二区三区在线观看视频 | 国产寡妇亲子伦一区二区三区四区 | 性xxxx视频 | 亚洲一区二区观看 | 老司机深夜福利视频 | 成年人网站免费在线观看 | 免费网站看av |